★ Exclusive: Check out the State of Meta in 4.0!
♦ Latest: 4.1 Livestream Redeem Codes
♦ Phase 2: Sparkxie, Sparkle, Cerydra, Rappa
♦ Upcoming: Ashveil, Silver Wolf Lv.999, Evanescia
♦ Events: Cosmicon, Roll On!, Ding! Arcadia Fun-Time Clock-In Essentials

Logistics Planning is a connection puzzle in the Aurum Alley's Hustle and Bustle event of Honkai: Star Rail. See the Aurum Alley logistics planning guides for Logistic Scores 30, 45, and 90 along with all the rewards here!
| Aurum Alley's Hustle and Bustle Guides | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Aurum Alley Custom Order Guide | |||||||||||||||||||||||
List of Contents

Connect the Oldies Depot to the score-boosting tile on the left side, then continue the line upwards towards the leftmost dock tile. After that, connect the Heron Express to the score-boosting tile on its left. Then, draw the rest of the route towards the middle dock tile.

To start, connect the Food Stall to the score-boosting tile to its left. Then connect it straight to the leftmost dock tile.
Use the score-boosting tile under Heron Express and connect it to the other tile northwest. Afterwards, draw a route towards the middle dock tile. From the far right, connect Oldies Depot to the rightmost dock tile.

Drag the Food Stall and connect it to the score-boosting tiles next ot it, then to the leftmost dock tile. For Heron Express, draw a route towards the score-boosting tiles near it and through the other tiles towards the middle dock tile.
Lastly, connect the Oldies Depot to the score-boosting tiles northeast, and draw a route to the rightmost dock tile.
Low Level Logistics Planning Guide

Start by connecting Artistry Hardware to the rightmost dock as shown above. Next, have the Longevity Hall route pass through the score-boosting tile at the bottom left followed by the ones in the middle. Finally, connect the rest of the route to the leftmost dock.

First, connect the Longevity Hall directly to the leftmost dock tile. Afterwards, use the score-boosting tiles above Delicacy Pavilion and the ones in the middle of the map, then connect it to the middle dock tile.
Lastly, connect the Artistry Hardware directly to the rightmost dock tile.

Connect the Longevity Hall to the L-shaped line of score-boosting tiles next to it, and draw a route to the leftmost dock tile. Then, draw a route for Delicacy Pavilion to the series of score-boosting tiles in the middle, and connect it to the middle dock tile.
Lastly, connect all the score-boosting tiles around Artistry Hardware and draw a route to the rightmost dock tile.
Mid Level Logistics Planning Guide

Connect Spices Supreme to the nearest score-boosting tile and draw the rest of the route towards the leftmost dock tile. Afterwards, connect Elegance Pagoda to the score-boosting tile above it and continue drawing the route towards the middle dock tile.

Draw a route upwards from Spices Supreme while grabbing the score-boosting tile above it and connect it to the leftmost dock tile.
The Elegance Pagoda route stays as it is previously. Connect Du's Teahouse directly to the score-boosting tiles on the lower left and connect it to the rightmost dock tile.

First, connect the Spices Supreme directly to the leftmost dock tile. Next, draw a route from Du's Teahouse to the series of score-boosting tiles on the bottom-left and center of the map and connect it to the middle dock tile.
Finally, draw a route along the buildings from Elegance Pagoda to the rightmost dock tile.
High Level Logistics Planning Guide

Logistics Planning is a game mode where you need to plan a route from the store to the docks to provide the docks with goods and orders.
Trailblazers will need to reach a required Logistic Score to establish a Merchant Collab, allowing you to continue the event quest and get more items in Inventory Arrangement.

Trailblazers will need to plan a route on how to connect the store to the docks. You can simply hold and drag the store icon and form a route to where the docks are.
Connecting the stores to the docks with the least amount of distance will get you a higher score.

To successfully complete each plan, you will have to reach the required logistics score displayed on the top left of the screen.
You can increase your score by forming the shortest route and passing through tiles with bonus effects.

To be able to reach the highest amount of Logistic Score available, you will have to complete Streetside Events, which unlocks tiles that give bonuses when passed through.
| Logistic Score | Unlock Condition |
|---|---|
| 15 | Progress the Back in Business (I) in the Aurum Alley Revival Phase 1 |
| 30 | Progress the Back in Business (I) in the Aurum Alley Revival Phase 1 |
| 45 | Complete the Merchant Event: Food Stand Event in Aurum Alley Revival Phase 1 |
| 90 | Available at the start of Back in Business (II) in the Aurum Alley Revival Phase 2 |
| Logistic Score | Unlock Condition |
|---|---|
| 15 | Progress the Back in Business (II) in Aurum Alley Revival Phase 2 |
| 30 | Complete the Merchant Event: Longevity Hall in Aurum Alley Revival Phase 2 |
| 45 | Complete the Merchant Event: Delicacy Pavilion in Aurum Alley Revival Phase 2 |
| 90 | Available at the start of Back in Business (III) in the Aurum Alley Revival Phase 3 |
| Logistic Score | Unlock Condition |
|---|---|
| 15 | Unlocks during Back in Business (III) in Aurum Alley Revival Phase 3 |
| 30 | Complete the Merchant Event: Elegance Pagoda in Aurum Alley Revival Phase 3 |
| 45 | Complete the Merchant Event: Du's Teahouse in Aurum Alley Revival Phase 3 |
| 90 | Complete the Merchant Event: Mr. Huo in the Aurum Alley Revival Phase 4 |

Meeting all the required logistics score will reward you with prosperity certificates, which you can use to progress your Guild Benefits.
Trailblazers will be able to get Trailblaze EXP, Stellar Jades, Upgrade Materials, and even Star Rail Passes as they progress their properity levels.

Logistics Planning is one of the game modes in the Aurum Alley's Hustle and Bustle event. Plan a route and connect the store to the docks and collect Prosperity Certificates to obtain a bunch of rewards!
Aurum Alley's Hustle and Bustle Event Guide

Aurum Alley's Hustle and Bustle Event Guide
| Aurum Alley Event Stages | |
|---|---|
Phase 1 |
Phase 2 |
Phase 3 |
Phase 4 |
| Logistic Planning Guides | ||
|---|---|---|
Low Level |
Mid Level |
High Level |
| All Merchant Collabs | |
|---|---|
| Related Aurum Alley Guides | |
|---|---|
Debate Guide |
Prosperity Certificate |
Ingenium Dreams |
Merchant Guild's Fund Guide |
Custom Order Guide |
|

Logistics Planning Event Guide



Genshin Impact Walkthrough & Guides Wiki
Honkai: Star Rail Walkthrough & Guides Wiki

Umamusume: Pretty Derby Walkthrough & Guides Wiki
Pokemon Pokopia Walkthrough & Guides Wiki

Resident Evil Requiem (RE9) Walkthrough & Guides Wiki

Monster Hunter Wilds Walkthrough & Guides Wiki

Wuthering Waves Walkthrough & Guides Wiki

Arknights: Endfield Walkthrough & Guides Wiki

Pokemon FireRed and LeafGreen (FRLG) Walkthrough & Guides Wiki
Pokemon TCG Pocket (PTCGP) Strategies & Guides Wiki

Diablo 4: Vessel of Hatred Walkthrough & Guides Wiki

Fire Emblem Heroes (FEH) Walkthrough & Guides Wiki
Yu-Gi-Oh! Master Duel Walkthrough & Guides Wiki
Super Smash Bros. Ultimate Walkthrough & Guides Wiki

Pokemon Brilliant Diamond and Shining Pearl (BDSP) Walkthrough & Guides Wiki

Elden Ring Shadow of the Erdtree Walkthrough & Guides Wiki

Monster Hunter World Walkthrough & Guides Wiki
The Legend of Zelda: Tears of the Kingdom Walkthrough & Guides Wiki

Persona 3 Reload Walkthrough & Guides Wiki
Cyberpunk 2077: Ultimate Edition Walkthrough & Guides Wiki
Copyright © 2024 HoYoverse, COGNOSPHERE. All Rights Reserved.
The copyrights of videos of games used in our content and other intellectual property rights belong to the provider of the game.
The contents we provide on this site were created personally by members of the Game8 editorial department.
We refuse the right to reuse or repost content taken without our permission such as data or images to other sites.