☆ Fox Hunt Multiplayer releases Oct. 30!
★ How to Get FOXHOUND Rank | Titles
☆ Missables | Unlockables
★ Best Weapons | Best Camos
☆ Which MGS Game to Pick at Start?

This is a list of all collectible locations in Metal Gear Solid Delta Snake Eater (MGS3 Remake). See a map of all the locations of Kerotan frogs, GA-KO ducks, Camouflage and Face Paint, including a checklist to mark your progress in this guide.
List of Contents
Type in location names to find specific collectibles, or type in the collectible type to filter by collectibles.
| Collectible | Location | |
|---|---|---|
Kerotan Frog 1 |
![]() ![]() Dremuchij South Mission: Virtuous Mission Type: Kerotan How to Get: After getting your backpack, backtrack to where you landed then head up the path to the northeast. At the top of the cliff, face south to find the Kerotan Frog and GA-KO next to each other. |
|
GA-KO Duck 1 |
![]() ![]() Dremuchij South Mission: Virtuous Mission Type: GA-KO How to Get: After getting your backpack, backtrack to where you landed then head up the path to the northeast. At the top of the cliff, face south to find the GA-KO and Kerotan Frog next to each other. |
|
Kerotan Frog 2 |
![]() ![]() Dremuchij Swampland Mission: Virtuous Mission Type: Kerotan How to Get: After passing the marshy area, you'll find the Kerotan off to your right (perched among the trees outside the map area). |
|
GA-KO Duck 2 |
![]() ![]() Dremuchij Swampland Mission: Virtuous Mission Type: GA-KO How to Get: Look towards the small island in the center of the muddy area with 2 crocodiles and a copse of trees. The GA-KO will be hidden in the middle of the trees. |
|
Kerotan Frog 3 |
![]() ![]() Dremuchij North Mission: Virtuous Mission Type: Kerotan How to Get: Found on top of a hollowed-out tree stump in the northeast corner of the area. There will be least 1 soldier patrolling this location. |
|
GA-KO Duck 3 |
![]() ![]() Dremuchij North Mission: Virtuous Mission Type: GA-KO How to Get: Once you enter this area, keep heading north. In the clearing with fallen leaves, you'll find a fallen log sitting flush against the north wall of the level. The GA-KO will be hidden sitting atop the log. |
|
Kerotan Frog 4 |
![]() ![]() Dolinovodno Mission: Virtuous Mission Type: Kerotan How to Get: Found on top of the rope bridge's southen supports. Upon arriving, simply look up at the top of each bridge support to find the Kerotan. |
|
GA-KO Duck 4 |
![]() ![]() Dolinovodno Mission: Virtuous Mission Type: GA-KO How to Get: As soon as you cross the rope bridge, look towards the rocky outcrop to the north. The GA-KO will be hidden sitting on the ledge a bit above eye-level. |
|
Kerotan Frog 5 |
![]() ![]() Rassvet Mission: Virtuous Mission Type: Kerotan How to Get: Found behind a broken wall beneath the only set of stairs in Rassvet. |
|
GA-KO Duck 5 |
![]() ![]() Rassvet Mission: Virtuous Mission Type: GA-KO How to Get: Found on the shelf in the room with an LF Med loot drop. |
|
Kerotan Frog 6 |
![]() ![]() Dremuchij East Mission: Operation Snake Eater Type: Kerotan How to Get: After reaching the bigger clearing north of where you spawned, look to the west side of the area to find a fallen tree. The Kerotan will be underneath it. |
|
GA-KO Duck 6 |
![]() ![]() Dremuchij East Mission: Operation Snake Eater Type: GA-KO How to Get: After reaching the bigger clearing north of where you spawned, look to the west side of the area to find a fallen tree. The GA-KO will be underneath it. |
|
Kerotan Frog 7 |
![]() ![]() Dremuchij South Mission: Operation Snake Eater Type: Kerotan How to Get: Found atop a rocky outcrop in the southwest corner of the area. Climb the fallen tree in the southwest and look for the Chaff Grenade drop - the Kerotan should on the ledge above the loot. |
|
GA-KO Duck 7 |
![]() ![]() Dremuchij South Mission: Operation Snake Eater Type: GA-KO How to Get: Head to the cliff at the south side of the area. Once there (facing south), look towards the cliff face to your right (eye-level). The GA-KO will be hidden along that cliff area. |
|
Kerotan Frog 8 |
![]() ![]() Dremuchij Swampland Mission: Operation Snake Eater Type: Kerotan How to Get: Head over to the center of the area (muddy area with crocodiles). You'll find the Kerotan to the northwest behind a group of thin trees. |
|
GA-KO Duck 8 |
![]() ![]() Dremuchij Swampland Mission: Operation Snake Eater Type: GA-KO How to Get: Once you reach the swamp area, go to the east side to find the hidden GA-KO sitting on top of a fallen log. |
|
Kerotan Frog 9 |
![]() ![]() Dremuchij North Mission: Operation Snake Eater Type: Kerotan How to Get: Found on top of a rocky outcrop near the center of the area. Climb the only climbable tree here then look west to see it. |
|
GA-KO Duck 9 |
![]() ![]() Dremuchij North Mission: Operation Snake Eater Type: GA-KO How to Get: Found on top of one of the burnt tree trunks next to the crash site. |
|
Kerotan Frog 10 |
![]() ![]() Dolinovodno Mission: Operation Snake Eater Type: Kerotan How to Get: Cross the rope bridge to reach the northern side. Once there, look east to see both the Kerotan and GA-KO perched on the cliff. |
|
GA-KO Duck 10 |
![]() ![]() Dolinovodno Mission: Operation Snake Eater Type: GA-KO How to Get: Cross the rope bridge to reach the northern side. Once there, look east to see both the GA-KO and Kerotan perched on the cliff. |
|
Kerotan Frog 11 |
![]() ![]() Rassvet Mission: Operation Snake Eater Type: Kerotan How to Get: Found beneath the only set of stairs in Rassvet. |
|
GA-KO Duck 11 |
![]() ![]() Rassvet Mission: Operation Snake Eater Type: GA-KO How to Get: Found on the roof of the building. Use the ladder on the east side to climb up then look southwest to see the hidden GA-KO on the roof. |
|
Kerotan Frog 12 |
![]() ![]() Chyornyj Prud Mission: Operation Snake Eater Type: Kerotan How to Get: Found underwater in the northern side of Chyornyj Prud. It will be directly below the tree that the GA-KO is perched on. |
|
GA-KO Duck 12 |
![]() ![]() Chyornyj Prud Mission: Operation Snake Eater Type: GA-KO How to Get: Swim over to the center of Chyornyj Prud north side. The hidden GA-KO will be sitting on the branch of the large tree. |
|
Kerotan Frog 13 |
![]() ![]() Bolshaya Past South Mission: Operation Snake Eater Type: Kerotan How to Get: Found hiding in a copse of trees beside the northernmost electric fence. It will be on the east side of the fence. |
|
GA-KO Duck 13 |
![]() ![]() Bolshaya Past South Mission: Operation Snake Eater Type: GA-KO How to Get: At the second electric fence, you'll have to climb a tree to cross to the other side. After climbing the tree, look behind you. On the branch to your upper left is the hidden GA-KO. |
|
Kerotan Frog 14 |
![]() ![]() Bolshaya Past Base Mission: Operation Snake Eater Type: Kerotan How to Get: Found underneath a desk in the central building of the base. |
|
GA-KO Duck 14 |
![]() ![]() Bolshaya Past Base Mission: Operation Snake Eater Type: GA-KO How to Get: Head over to the northeast armory of the base. The hidden GA-KO will be sitting on the northwest roof corner of the armory. |
|
Kerotan Frog 15 |
![]() ![]() Bolshaya Past Crevice Mission: Operation Snake Eater Type: Kerotan How to Get: Upon spawning, look southeast towards the tall grass (on the side where Ocelot's men are). The Kerotan will be hiding in the grass. |
|
GA-KO Duck 15 |
![]() ![]() Bolshaya Past Crevice Mission: Operation Snake Eater Type: GA-KO How to Get: As soon as you spawn in, go to the west side of your platform then look north. Just after the tall grass in Ocelot's side of the arena, you'll find the hidden GA-KO among the rocks. If you can't spot it, chuck a grenade in the general vicinity to collect it. |
|
Kerotan Frog 16 |
![]() ![]() Chyornaya Peschera Cave Branch Mission: Operation Snake Eater Type: Kerotan How to Get: After reaching the cave with 3 branching paths, take the one that leads west then keep following it until it loops around the area and into a cave with a hole. The Kerotan will be inside this cave along with the NVGs. |
|
GA-KO Duck 16 |
![]() ![]() Chyornaya Peschera Cave Branch Mission: Operation Snake Eater Type: GA-KO How to Get: As soon as you reach the cave with 3 branching paths, take the middle path. After you crawl through the small tunnel, you'll emerge at the top of a small waterfall. The hidden GA-KO will be on the rock directly in front of you as you emerge from the tunnel. |
|
Kerotan Frog 17 |
![]() ![]() Chyornaya Peschera Cave Mission: Operation Snake Eater Type: Kerotan How to Get: Perched on the large cave roof opening near The Pain's platform. After beating the boss, simply look up to find the opening with the Kerotan. |
|
GA-KO Duck 17 |
![]() ![]() Chyornaya Peschera Cave Mission: Operation Snake Eater Type: GA-KO How to Get: Perched on one of the cave roof openings south of The Pain's platform. After beating the boss, look up to find the opening with the hidden GA-KO. |
|
Kerotan Frog 18 |
![]() ![]() Chyornaya Peschera Cave Entrance Mission: Operation Snake Eater Type: Kerotan How to Get: Found inside the small cave with ammo and 3 claymores. Disable the claymores then look behind and up as soon as you enter to see the Kerotan. |
|
GA-KO Duck 18 |
![]() ![]() Chyornaya Peschera Cave Entrance Mission: Operation Snake Eater Type: GA-KO How to Get: As you exit into the northernmost cave area, you'll see a green mushroom on the ground. Stop here and look at the large gap across from you. The GA-KO will be hidden along these ledges. |
|
Kerotan Frog 19 |
![]() ![]() Ponizovje South Mission: Operation Snake Eater Type: Kerotan How to Get: After exiting into Ponizovje South, look at the area to your left. You'll find the Kerotan among the roots of the mangroves. |
|
GA-KO Duck 19 |
![]() ![]() Ponizovje South Mission: Operation Snake Eater Type: GA-KO How to Get: After swimming towards the north end of the area (right before the fork in the river), resurface once you find a few Chaff Grenades underwater. Then, look to the west to find the hidden GA-KO amongst the fallen logs. |
|
Kerotan Frog 20 |
![]() ![]() Ponizovje West Mission: Operation Snake Eater Type: Kerotan How to Get: Approach the docks then dive. You'll find the Kerotan underwater inside one of the pipes at the base of the docks. |
|
GA-KO Duck 20 |
![]() ![]() Ponizovje West Mission: Operation Snake Eater Type: GA-KO How to Get: Found on a concrete ledge at the east side of the docks. Look up to find the GA-KO hidden against the cliff face. |
|
Kerotan Frog 21 |
![]() ![]() Ponizovje Warehouse Exterior Mission: Operation Snake Eater Type: Kerotan How to Get: After entering the area, look to your west. The Kerotan will be on top of one of the dock gates's hinge pillars. |
|
GA-KO Duck 21 |
![]() ![]() Ponizovje Warehouse Exterior Mission: Operation Snake Eater Type: GA-KO How to Get: Found hidden on top of the concrete wall attached to the water gate in the area's west side. It is directly north of the Kerotan. |
|
Kerotan Frog 22 |
![]() ![]() Ponizovje Warehouse Mission: Operation Snake Eater Type: Kerotan How to Get: After dealing with the soldiers, go to the first floor of the warehouse then look up (northeast) to find it along one of the concrete girders. |
|
GA-KO Duck 22 |
![]() ![]() Ponizovje Warehouse Mission: Operation Snake Eater Type: GA-KO How to Get: After climbing the stairs to reach the third floor, look south then to your right. The hidden GA-KO will be on top of one of the large metal pipes. |
|
Kerotan Frog 23 |
![]() ![]() Graniny Gorki Lab Exterior Outer Walls Mission: Operation Snake Eater Type: Kerotan How to Get: Upon arriving in the area, head west. Crawl under the gap in the electric fence then look up at the western wall of the level. The Kerotan will be there among the trees. |
|
GA-KO Duck 23 |
![]() ![]() Graniny Gorki Lab Exterior Outer Walls Mission: Operation Snake Eater Type: GA-KO How to Get: After passing through the electric fence in the west, go towards the center of the map (where the 2 soldiers and dog area). Deal with them then look up at the top of the closed metal gate at the center. The hidden GA-KO will be on top. |
|
Kerotan Frog 24 |
![]() ![]() Graniny Gorki Lab Exterior Inner Walls Mission: Operation Snake Eater Type: Kerotan How to Get: Go to the small building in the east side of the compound. Look inside the window to find the Kerotan. |
|
GA-KO Duck 24 |
![]() ![]() Graniny Gorki Lab Exterior Inner Walls Mission: Operation Snake Eater Type: GA-KO How to Get: After getting into the Inner Walls area, look up at the lamp posts in the west side of the compound. The hidden GA-KO will be sitting on top one of them. |
|
Kerotan Frog 25 |
![]() ![]() Graniny Gorki Lab 1F Mission: Operation Snake Eater Type: Kerotan How to Get: Found on top of the lockers in the east side of the building's first floor. |
|
GA-KO Duck 25 |
![]() ![]() Graniny Gorki Lab 2F Mission: Operation Snake Eater Type: GA-KO How to Get: Go to the second floor and look for the red door that leads out onto the balcony overlooking the small center courtyard of the building (there should be a Book to loot nearby). Once there, look down to your left. The GA-KO will be hidden, sitting on top of a windowsill. |
|
Kerotan Frog 26 |
![]() ![]() Graniny Gorki Lab B1 East Mission: Operation Snake Eater Type: Kerotan How to Get: Inside the final jail cell at the end of hall. |
|
GA-KO Duck 26 |
![]() ![]() Graniny Gorki Lab B1 East Mission: Operation Snake Eater Type: GA-KO How to Get: After you go down to B1 East, enter the guard room to your right. The hidden GA-KO will be on top of the shelf next to a large framed picture. |
|
Kerotan Frog 27 |
![]() ![]() Graniny Gorki Lab B1 West Mission: Operation Snake Eater Type: Kerotan How to Get: It will be in the first room with a scientist after you reach level B1. The Kerotan will be on a shelf next to a locker. |
|
GA-KO Duck 27 |
![]() ![]() Graniny Gorki Lab B1 West Mission: Operation Snake Eater Type: GA-KO How to Get: In the room with lots of scientists and computer desks, the hidden GA-KO will be found against one of the computers in the southeast corner of the room (next to the Battery drop). |
|
Kerotan Frog 28 |
![]() ![]() Graniny Gorki South Mission: Operation Snake Eater Type: Kerotan How to Get: Head over to the exit of the area to the north. Before you climb up the ledge leading to the exit, look to your left (west). The Kerotan will be on the branch of the nearby tree. Possible to get this before or after The Fear boss fight. |
|
GA-KO Duck 28 |
![]() ![]() Graniny Gorki South Mission: Operation Snake Eater Type: GA-KO How to Get: Found hidden on top of a tree at the center of the arena. Can be easily spotted by climbing the tree at the southeast section of the arena. Can be obtained before or after The Fear boss fight. |
|
Kerotan Frog 29 |
![]() ![]() Svyatogornyj South Mission: Operation Snake Eater Type: Kerotan How to Get: After exiting into Svyatogornyj South, look above to your southwest. It will be perched on the concrete structure. |
|
GA-KO Duck 29 |
![]() ![]() Svyatogornyj South Mission: Operation Snake Eater Type: GA-KO How to Get: Go up the climable tree at the south of the area then, once on the branch, look towards the northeast. It may be difficult to spot, but the hidden GA-KO will be among the trees and green undergrowth. |
|
Kerotan Frog 30 |
![]() ![]() Svyatogornyj West Mission: Operation Snake Eater Type: Kerotan How to Get: After exiting into Svyatogornyj West, go left until you reach a muddy area with a few fallen logs. The Kerotan should be on a small ledge along the west wall of the level. |
|
GA-KO Duck 30 |
![]() ![]() Svyatogornyj West Mission: Operation Snake Eater Type: GA-KO How to Get: After entering the area, take the path to your right (east). Follow it until right before you exit into a large clearing. Along this narrow path, you'll find a short treep stump along the wall to your left with the hidden GA-KO sitting on top of it. |
|
Kerotan Frog 31 |
![]() ![]() Svyatogornyj East 1F Mission: Operation Snake Eater Type: Kerotan How to Get: Found on a shelf inside the bunkroom of the large house at the northeast corner of the map. Look out for the soldier patrolling the interior. |
|
GA-KO Duck 31 |
![]() ![]() Svyatogornyj East 1F Mission: Operation Snake Eater Type: GA-KO How to Get: Climb up the roof of the house (using the tree to its north). Once there, look at the rocky outcrop to the west. The hidden GA-KO will be hiding along that outcrop's rocky face. |
|
Kerotan Frog 32 |
![]() ![]() Sokrovenno South Mission: Operation Snake Eater Type: Kerotan How to Get: Found on a ledge behind the storehouse in the northwest side of the arena. Deal with The End first before attempting to get this Kerotan. |
|
GA-KO Duck 32 |
![]() ![]() Sokrovenno South Mission: Operation Snake Eater Type: GA-KO How to Get: At the large central cliff to the north of the area, you'll find the hidden GA-KO sitting against the gray rocky cliff face. Best collected after beating The End. |
|
Kerotan Frog 33 |
![]() ![]() Sokrovenno West Mission: Operation Snake Eater Type: Kerotan How to Get: At the southern end of the river, you'll find a small opening (where the water flows to). The Kerotan will be inside. Deal with The End first before attempting to get this Kerotan. |
|
GA-KO Duck 33 |
![]() ![]() Sokrovenno West Mission: Operation Snake Eater Type: GA-KO How to Get: At the opposite end of the river to the north, you'll find the hidden GA-KO sitting in a small alcove where the waterflow starts from. Best collected after beating The End. |
|
Kerotan Frog 34 |
![]() ![]() Sokrovenno North Mission: Operation Snake Eater Type: Kerotan How to Get: Found at the foot of a lone treee that sit flush against the central bend of the area. Deal with The End first before attempting to get this Kerotan. |
|
GA-KO Duck 34 |
![]() ![]() Sokrovenno North Mission: Operation Snake Eater Type: GA-KO How to Get: Found hidden on a small ledge in the northeast side of the arena. To find it, look for the singular fallen log in this corner of the map. Then, look to the log's northwest to see the GA-KO among the rocks. |
|
Kerotan Frog 35 |
![]() ![]() Krasnogorje Tunnel Mission: Operation Snake Eater Type: Kerotan How to Get: Found hiding behind one of the pillars before you climb the very long ladder. |
|
GA-KO Duck 35 |
![]() ![]() Krasnogorje Tunnel Mission: Operation Snake Eater Type: GA-KO How to Get: After reaching the top of ladder, look up at the pipes to your left to find the hidden GA-KO. |
|
Kerotan Frog 36 |
![]() ![]() Krasnogorje Mountain Base Mission: Operation Snake Eater Type: Kerotan How to Get: Before exiting the area to the north, head to the cliff to the west and look up and north. You'll find the Kerotan sitting on top of the large rocky outcrop. |
|
GA-KO Duck 36 |
![]() ![]() Krasnogorje Mountain Base Mission: Operation Snake Eater Type: GA-KO How to Get: Midway through the large patch of open ground, you'll find a huge boulder you can crawl under. The hidden GA-KO sits on top of it. |
|
Kerotan Frog 37 |
![]() ![]() Krasnogorje Mountainside Mission: Operation Snake Eater Type: Kerotan How to Get: Near the exit to the east are 3 small storehouses. The Kerotan is found on the roof of the very last one (the storehouse with food in it). |
|
GA-KO Duck 37 |
![]() ![]() Krasnogorje Mountainside Mission: Operation Snake Eater Type: GA-KO How to Get: As you climb the winding path against the mountainside, make sure to periodically check south towards the cliff face to find a small growth of plants that conceal the hidden GA-KO. |
|
Kerotan Frog 38 |
![]() ![]() Krasnogorje Mountaintop Mission: Operation Snake Eater Type: Kerotan How to Get: After exiting into Krasnogorje Mountaintop, head towards the anti-aircraft gun emplacement on the southeast corner of the map. The Kerotan will be directly across it (to its south) right on top of a small patch of snow. |
|
GA-KO Duck 38 |
![]() ![]() Krasnogorje Mountaintop Mission: Operation Snake Eater Type: GA-KO How to Get: Found on the rocky slope behind the northernmost anti-aircraft gun. The GA-KO sits hidden amongst the rocks. |
|
Kerotan Frog 39 |
![]() ![]() Krasnogorje Mountaintop Behind Ruins Mission: Operation Snake Eater Type: Kerotan How to Get: After the cutscene ends, you'll be overlooking Groznyj Grad. Use a sniper to look at the large radio tower labeled 07. The Kerotan will be on the ledge with the large 07 numbering. |
|
GA-KO Duck 39 |
![]() ![]() Krasnogorje Mountaintop Behind Ruins Mission: Operation Snake Eater Type: GA-KO How to Get: This one is a bit tricky to find. As you exit the cutscene, equip a sniper and look down towards the snowy slopes across your cliff. You should see a hidden GA-KO along the ridge against the backdrop of snow. |
|
Kerotan Frog 40 |
![]() ![]() Krasnogorje Mountaintop Ruins Mission: Operation Snake Eater Type: Kerotan How to Get: Right before the door leading to Krasnogorje Mountaintop, look at the shelf on top of the bedframe to find the Kerotan. |
|
GA-KO Duck 40 |
![]() ![]() Krasnogorje Mountaintop Ruins Mission: Operation Snake Eater Type: GA-KO How to Get: In the room with the bedframe, look towards the ceiling until you spot a hole. The hidden GA-KO will be there for you to shoot. |
|
Kerotan Frog 41 |
![]() ![]() Groznyj Grad Underground Tunnel Mission: Operation Snake Eater Type: Kerotan How to Get: After going down the stairs, start heading north. As soon as the area opens up into the boss arena, look directly ahead of you to find the Kerotan on one of the pipes above the arena. |
|
GA-KO Duck 41 |
![]() ![]() Groznyj Grad Underground Tunnel Mission: Operation Snake Eater Type: GA-KO How to Get: Only obtainable during The Fury boss fight. As soon as the fight begins, run to the westernmost corridor of the arena. Then look for an opening along the western wall to find the hidden GA-KO sitting atop a pipe. |
|
Kerotan Frog 42 |
![]() ![]() Groznyj Grad Southwest Mission: Operation Snake Eater Type: Kerotan How to Get: Found sitting on top of a tank inside the middle vehicle bay on the east side of the area. Look through the partially open doors to see the Kerotan on the tank. |
|
GA-KO Duck 42 |
![]() ![]() Groznyj Grad Southwest Mission: Operation Snake Eater Type: GA-KO How to Get: There are 6 vehicle bays in this area. Look at the vehicle bay nearest to the north of the compound. You'll find the hidden GA-KO sitting above its doors. |
|
Kerotan Frog 43 |
![]() ![]() Groznyj Grad Northeast Mission: Operation Snake Eater Type: Kerotan How to Get: Head northeast, past the watchtower, until you see a storehouse with food. Right next to it is an opening on the ground that leads to a vent system you can crawl into. Crawl through this and you'll find the Kerotan in one of the side passages of the vent. |
|
GA-KO Duck 43 |
![]() ![]() Groznyj Grad Northeast Mission: Operation Snake Eater Type: GA-KO How to Get: Head over to the watchtower on the east side of the compound. Sitting atop the southwest klakon tower is the hidden GA-KO. |
|
Kerotan Frog 44 |
![]() ![]() Groznyj Grad Southeast Mission: Operation Snake Eater Type: Kerotan How to Get: Go up the red set of stairs to reach the roof. Then, look towards the southwest corner to find the Kerotan. |
|
GA-KO Duck 44 |
![]() ![]() Groznyj Grad Southeast Mission: Operation Snake Eater Type: GA-KO How to Get: Head towards the south side of the compound where a parked halftrack sits. Then, look along the southern wall until you spot a klaxon tower. The hidden GA-KO will be sitting on top of it. |
|
Kerotan Frog 45 |
![]() ![]() Groznyj Grad Torture Room Mission: Operation Snake Eater Type: Kerotan How to Get: Located underneath one of the desks in the guard room of the jail. This is the same room that you find the Camera in. |
|
GA-KO Duck 45 |
![]() ![]() Groznyj Grad Torture Room Mission: Operation Snake Eater Type: GA-KO How to Get: As you enter the Torture Room, go right instead of left and look for the small room with a bed. The hidden GA-KO will be sitting on top of shelf next to a poster of a woman. |
|
Kerotan Frog 46 |
![]() ![]() Groznyj Grad Northwest Mission: Operation Snake Eater Type: Kerotan How to Get: Head over to the watchtower on the west side of the large parking area. Climb on the boxes near it and look west. The Kerotan will be on top of a set of stairs. |
|
GA-KO Duck 46 |
![]() ![]() Groznyj Grad Northwest Mission: Operation Snake Eater Type: GA-KO How to Get: Found sitting on top of one of the tanks. While hidden, this one is easy to spot and it can be revisited in the morning when you return to Groznyj Grad Northwest. |
|
Kerotan Frog 47 |
![]() ![]() Groznyj Grad Weapons Lab East Wing Mission: Operation Snake Eater Type: Kerotan How to Get: Found in the second floor of the Weapons Lab East Wing. It will be on the shelf of the small office area (north of the lockers where you stuff Raikov). |
|
GA-KO Duck 47 |
![]() ![]() Groznyj Grad Weapons Lab East Wing Mission: Operation Snake Eater Type: GA-KO How to Get: At the lobby in the first floor, there is a small display of plants. The GA-KO will be hidden beside the plants. |
|
Kerotan Frog 48 |
![]() ![]() Tikhogornyj Mission: Operation Snake Eater Type: Kerotan How to Get: As soon as you spawn in after The Sorrow boss fight, look behind you to find the Kerotan. You can use the Fork to melee and get it. |
|
GA-KO Duck 48 |
![]() ![]() Tikhogornyj Mission: Operation Snake Eater Type: GA-KO How to Get: Right before you go to the back of the waterfall to meet with EVA, you'll find the hidden GA-KO on a ledge to the west of the waterfall. Retrieve your weapons from EVA to get something to shoot this GA-KO with. |
|
Kerotan Frog 49 |
![]() ![]() Tikhogornyj Behind Waterfall Mission: Operation Snake Eater Type: Kerotan How to Get: Right before taking the ladder leading up to Groznyj Grad, look towards the southwest side of the room. The Kerotan will be on the pipes above you. |
|
GA-KO Duck 49 |
![]() ![]() Tikhogornyj Behind Waterfall Mission: Operation Snake Eater Type: GA-KO How to Get: Found hidden behind an iron grated fence in the second alcove to your right as you head down the long tunnel. |
|
Kerotan Frog 50 |
![]() ![]() Groznyj Grad Weapons Lab West Wing Corridor Mission: Operation Snake Eater Type: Kerotan How to Get: As soon as you enter the West Wing Corridor, look outside the window to your left (south). The Kerotan will be on top of the klaxon tower waiting to be shot by a sniper. Better to get this when you return to Groznyj Grad after getting tortured. |
|
GA-KO Duck 50 |
![]() ![]() Groznyj Grad Weapons Lab West Wing Corridor Mission: Operation Snake Eater Type: GA-KO How to Get: Can only be obtained after you return to Groznyj Grad. Once you do, head towards the loot on the ground then look outside to your left (south). The hidden GA-KO will be sitting on the windowsill. |
|
Kerotan Frog 51 |
![]() ![]() Groznyj Grad Weapons Lab Main Wing Mission: Operation Snake Eater Type: Kerotan How to Get: Found hiding next to the consoles on the west side of the inert Shagohod. A maintenance worker will be using the consoles, so wait for them to leave before getting this Kerotan. |
|
GA-KO Duck 51 |
![]() ![]() Groznyj Grad Weapons Lab Main Wing Mission: Operation Snake Eater Type: GA-KO How to Get: This hard-to-spot GA-KO will be hidden and sitting along the metal girders on the central west side of the large main wing warehouse. If you're having trouble finding it, simply spam RPG-7 shots into the west side ceiling until you get it (you can always reload a save to avoid getting alerts). |
|
Kerotan Frog 52 |
![]() ![]() Groznyj Grad B1F Mission: Operation Snake Eater Type: Kerotan How to Get: As soon as you spawn into the boss fight, look towards the southwest and up. You'll find the Kerotan peeking from the upper edge of the makeshift arena. |
|
GA-KO Duck 52 |
![]() ![]() Groznyj Grad B1F Mission: Operation Snake Eater Type: GA-KO How to Get: As soon as the boss fight starts, look east and you'll find the hidden GA-KO sitting on top of a metal cage. |
|
Kerotan Frog 53 |
Groznyj Grad Sidecar Mission: Operation Snake Eater Type: Kerotan How to Get: When the sidecar first stops, you'll see a watchtower directly in front of you. The Kerotan will be on top of the searchlight. |
|
GA-KO Duck 53 |
Groznyj Grad Sidecar Mission: Operation Snake Eater Type: GA-KO How to Get: When you stop at the second area with the tanks, you'll see a watchtower to your left that has the hidden GA-KO sitting on the balcony area. |
|
Kerotan Frog 54 |
Groznyj Grad Runway South Mission: Operation Snake Eater Type: Kerotan How to Get: When the sidecar first stops in the central area of the compound, look at the forklift to your right. The Kerotan will be on the seat of the forklift. |
|
GA-KO Duck 54 |
Groznyj Grad Runway South Mission: Operation Snake Eater Type: GA-KO How to Get: When you stop at the center area, the hidden GA-KO will be sitting on top of a water tank to your right (opposite the forklift with the Kerotan). |
|
Kerotan Frog 55 |
Groznyj Grad Runway Part 1 Mission: Operation Snake Eater Type: Kerotan How to Get: Found on top of one of the distance markers on the runway. Keep Snake looking forward then train your weapon towards the left side of the runway. The Kerotan will be sitting on top of the No. 7 distance marker. |
|
GA-KO Duck 55 |
Groznyj Grad Runway Part 1 Mission: Operation Snake Eater Type: GA-KO How to Get: Found on top of one of the distance markers on the runway. Keep Snake looking forward then train your weapon towards the left side of the runway. The hidden GA-KO will be sitting on top of the No. 11 distance marker. |
|
Kerotan Frog 56 |
Groznyj Grad Runway Part 2 Mission: Operation Snake Eater Type: Kerotan How to Get: Found on top of one of the distance markers on the runway. Keep Snake looking forward then train your weapon towards the right side of the runway. The Kerotan will be sitting on top of the No. 18 distance marker. |
|
GA-KO Duck 56 |
Groznyj Grad Runway Part 2 Mission: Operation Snake Eater Type: GA-KO How to Get: Found on top of a concrete bollard in the left side of runway. Keep Snake looking forward then train your weapon towards the left side of the runway. After passing the Kerotan, the hidden GA-KO will be found on top of the bollards between the No. 25 and No. 26 distance markers. |
|
Kerotan Frog 57 |
![]() ![]() Groznyj Grad Rail Bridge Part 1 Mission: Operation Snake Eater Type: Kerotan How to Get: During the sniping segment, stand up then look towards the bottom left of the bridge to see the Kerotan on one of the girders. |
|
GA-KO Duck 57 |
![]() ![]() Groznyj Grad Rail Bridge Part 1 Mission: Operation Snake Eater Type: GA-KO How to Get: During the sniping segment, look towards the cliff opposite you. The hidden GA-KO will be among the rocks next to the opposite side of the bridge. |
|
Kerotan Frog 58 |
![]() ![]() Groznyj Grad Rail Bridge Part 2 Mission: Operation Snake Eater Type: Kerotan How to Get: As soon as you spawn in, zoom into the radio tower directly in front of you (northwest of the arena). The Kerotan will be near the top of the radio tower's concrete base. |
|
GA-KO Duck 58 |
![]() ![]() Groznyj Grad Rail Bridge Part 2 Mission: Operation Snake Eater Type: GA-KO How to Get: Upon spawning run towards the south of the arena. The hidden GA-KO will be on a ruined support pipe that used to be part of the bridge. |
|
Kerotan Frog 59 |
Groznyj Grad Rail Bridge North Mission: Operation Snake Eater Type: Kerotan How to Get: Found in front of the armored cars during the second ambush near the end of the level. |
|
GA-KO Duck 59 |
Groznyj Grad Rail Bridge North Mission: Operation Snake Eater Type: GA-KO How to Get: At the very first ambush site near the end of the level, you'll find the hidden GA-KO on the front bumper of one of the trucks. |
|
Kerotan Frog 60 |
Lazorevo South Mission: Operation Snake Eater Type: Kerotan How to Get: Sitting in front of a large rock near the start of the level. To avoid missing it, keep Snake looking forward then keep your eyes peeled for a semi-circle rock in front of you as you move to find the Kerotan on the ground in front of it. |
|
GA-KO Duck 60 |
Lazorevo South Mission: Operation Snake Eater Type: GA-KO How to Get: This one is a bit tricky to find. Keep looking forward and train your gun towards the left side of the long road. You'll find the hidden GA-KO sitting on top of a fallen tree midway through the level. |
|
Kerotan Frog 61 |
Lazorevo North Mission: Operation Snake Eater Type: Kerotan How to Get: As soon as you enter the area, face forward in first person and keep your aim trained towards your left. The Kerotan will be on top of a rock to your left. |
|
GA-KO Duck 61 |
Lazorevo North Mission: Operation Snake Eater Type: GA-KO How to Get: Found on a rock to your right when you cross the river for the first time at the start of the level. |
|
Kerotan Frog 62 |
![]() ![]() Zaozyorje West Mission: Operation Snake Eater Type: Kerotan How to Get: The Kerotan will be on a ledge below the log bridge you cross over a large chasm in the southwest corner of the map. |
|
GA-KO Duck 62 |
![]() ![]() Zaozyorje West Mission: Operation Snake Eater Type: GA-KO How to Get: The hidden GA-KO will be on a ledge below the log bridge you cross over a large chasm in the southwest corner of the map. It is the same chasm where you find the Kerotan. |
|
Kerotan Frog 63 |
![]() ![]() Zaozyorje East Mission: Operation Snake Eater Type: Kerotan How to Get: Found behind a large tree trunk at the start of the forking path near the center of this area. |
|
GA-KO Duck 63 |
![]() ![]() Zaozyorje East Mission: Operation Snake Eater Type: GA-KO How to Get: In the final clearing leading to the objective, the hidden GA-KO will be sitting on a cliff on the north side of the map (to the left of the path where you escort EVA). |
|
Kerotan Frog 64 |
![]() ![]() Rokovoj Bereg Mission: Operation Snake Eater Type: Kerotan How to Get: Found on top of one of the tall white tree trunks in the arena. Simply look up to find the telltale green tinge of the Kerotan. |
|
GA-KO Duck 64 |
![]() ![]() Rokovoj Bereg Mission: Operation Snake Eater Type: GA-KO How to Get: Found on top of one of the tall white tree trunks in the arena. Look up and check each pale tree to find the hidden GA-KO. |
|
Black |
Type: Camouflage How to Get: Unlocked by default. |
|
Choco Chip |
Type: Camouflage How to Get: Looted from a hollowed-out tree stump in Bolshaya Past South (northwest after the final electric fence). |
|
Fly |
Type: Camouflage How to Get: Looted from the final bathroom stall in Graniny Gorki Lab 2F. Punch out the door to open it. |
|
GA-KO |
Type: Camouflage How to Get: Looted from the shallow water in the northeast corner of Chyornyj Prud. |
|
Leaf |
Type: Camouflage How to Get: Unlocked by default. |
|
Maintenance |
Type: Camouflage How to Get: Looted from one of the lockers in the Groznyj Grad Weapons Lab: East Wing 2F. Only spawns in if you revisit the location after getting tortured. |
|
Naked |
Type: Camouflage How to Get: Unlocked by default. |
|
Officer |
Type: Camouflage How to Get: Obtained from Raikov in the Groznyj Grad Weapons Lab: East Wing. Knock him out then stuff him in one of the 2F lockers to get this. |
|
Olive Drab |
Type: Camouflage How to Get: Unlocked by default. |
|
Raindrop |
Type: Camouflage How to Get: Looted from beneath the northern end of the rope bridge in Dolinovodno during Operation Snake Eater. |
|
Scientist |
Type: Camouflage How to Get: Given to you by EVA when you meet her in Rassvet during Operation Snake Eater. |
|
Sneaking Suit |
Type: Camouflage How to Get: Obtained from the same locker where you stuffed Raikov in Groznyj Grad Weapons Lab: East Wing 2F. Only spawns in if you revisit the location after getting tortured. |
|
Snow |
Type: Camouflage How to Get: Obtained from a small tunnel in Chyornaya Peschera Cave, just before The Pain boss fight. |
|
Spirit |
Type: Camouflage How to Get: Defeat The Sorrow. |
|
Splitter |
Type: Camouflage How to Get: Obtained from atop a raised platform of earth at the east side of Bolshaya Past South. You'll have to shimmy across a long narrow ledge to reach the platform. |
|
Squares |
Type: Camouflage How to Get: Unlocked by default. |
|
Tiger Stripe |
Type: Camouflage How to Get: Unlocked by default. |
|
Tree Bark |
Type: Camouflage How to Get: Unlocked by default. |
|
Water |
Type: Camouflage How to Get: Obtained from the roof of the central building in Bolshaya Past Base. |
|
AUSCAM |
Type: Camouflage How to Get: Choose I like MGS 1 when starting a new game. Also unlocked after finishing the game once. |
|
Banana |
Type: Camouflage How to Get: Choose I like MGS: Peace Walker when starting a new game. Also unlocked after finishing the game once. |
|
Brown |
Type: Face Paint How to Get: Choose I like MGS 4 when starting a new game. Also unlocked after finishing the game once. |
|
Desert Tiger |
Type: Camouflage How to Get: Choose I like MGS 2 when starting a new game. Also unlocked after finishing the game once. |
|
DPM |
Type: Camouflage How to Get: Choose I like MGS 1 when starting a new game. Also unlocked after finishing the game once. |
|
Flecktarn |
Type: Camouflage How to Get: Choose I like MGS 3 when starting a new game. Also unlocked after finishing the game once. |
|
Green |
Type: Face Paint How to Get: Choose I like MGS 4 when starting a new game. Also unlocked after finishing the game once. |
|
| Infinity |
Type: Face Paint How to Get: Finish the game with a captured Tsuchinoko or get a FOXHOUND ranking after finishing a playthrough. |
|
Kabuki |
Type: Face Paint How to Get: Found underwater at the base of the waterfall in Tikhogornyj. Backtrack after getting your equipment from EVA to find it. |
|
Tuxedo |
Type: Camouflage How to Get: Beat the game for the first time. |
|
| Water |
Type: Face Paint How to Get: Found underwater near the southern end of Ponizovje South. It only appears after defeating The Fear. |
|
Animals |
Type: Camouflage How to Get: Defeat Ocelot non-lethally. |
|
Hornet Stripe |
Type: Camouflage How to Get: Defeat The Pain non-lethally. |
|
Spider |
Type: Camouflage How to Get: Defeat The Fear non-lethally. |
|
Moss |
Type: Camouflage How to Get: Hold up The End to get him to drop this camo. |
|
Fire |
Type: Camouflage How to Get: Defeat The Fury non-lethally. |
|
Cold War |
Type: Camouflage How to Get: Defeat Volgin non-lethally. |
|
Snake |
Type: Camouflage How to Get: Defeat The Boss non-lethally. |
|
Black |
Type: Face Paint How to Get: Unlocked by default. |
|
Desert |
Type: Face Paint How to Get: Obtained from the first floor of Ponizovje Warehouse. |
|
Mask |
Type: Face Paint How to Get: Unlocked by default. |
|
No Paint |
Type: Face Paint How to Get: Unlocked by default. |
|
Oyama |
Type: Face Paint How to Get: Found in the vents of Graniny Gorki Lab 1F. The vent entrance is located in the center courtyard of the building. |
|
Snow |
Type: Face Paint How to Get: Found in the southwest trenches of Bolshaya Past Base. |
|
Splitter |
Type: Face Paint How to Get: Unlocked by default. |
|
Woodland |
Type: Face Paint How to Get: Unlocked by default. |
|
Zombie |
Type: Face Paint How to Get: Found in the northern end of Rassvet during Operation Snake Eater. |
|
Grenade |
Type: Camouflage How to Get: Choose I like everything in the MGS series when starting a new game. Also unlocked after finishing the game once. |
|
Mummy |
Type: Camouflage How to Get: Choose I'm playing MGS for the first time when starting a new game. Also unlocked after finishing the game once. |
|
Santa Claus |
Type: Camouflage How to Get: Beat the game for the first time. |
|
St. Valentine |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Former East Germany |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Former West Germany |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Soviet Woodland |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Urban Tiger |
Type: Camouflage How to Get: Beat the game for the first time. |
|
KLMK |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Rainbow |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Chameleon |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Barracuda |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Festival |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Dododo |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Rock |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Watersnake |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Night Desert |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Swamp |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Flower |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Anubis |
Type: Camouflage How to Get: Beat the game for the first time. |
|
Sneaking Suit (PW ver.) |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
Battle Dress (PW ver.) |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
White Tuxedo |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
Crocodile Suit |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
Naked Woodland |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
Naked Ammunition Belt |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
Gold |
Type: Camouflage How to Get: Purchase the Digital Deluxe Edition. |
|
Soviet Union |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
UK |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
France |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
Germany |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
Italy |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
Spain |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
Sweden |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
Japan |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
USA |
Type: Face Paint How to Get: Choose I like MGS V when starting a new game. Also unlocked after finishing the game once. |
|
Glasses |
Type: Face Paint How to Get: Purchase the Digital Deluxe Edition. |
|
Sunglasses |
Type: Face Paint How to Get: Purchase the Digital Deluxe Edition. |
|
King Cobra |
![]() ![]() Dremuchij North Type: Snake |
|
Taiwanese Cobra |
![]() ![]() Chyornaya Peschera Cave Branch Type: Snake |
|
Thai Cobra |
![]() ![]() Chyornaya Peschera Cave Entrance Type: Snake |
|
Coral Snake |
![]() ![]() Chyornyj Prud Type: Snake |
|
Milk Snake |
![]() ![]() Chyornyj Prud Type: Snake |
|
Green Tree Python |
![]() ![]() Dremuchij North Type: Snake |
|
Giant Anaconda |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Snake |
|
Reticulated Python |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Snake |
|
Snake Liquid |
![]() ![]() Rokovoj Bereg Type: Snake |
|
Snake Solid |
![]() ![]() Rokovoj Bereg Type: Snake |
|
Snake Solidus |
![]() ![]() Rokovoj Bereg Type: Snake |
|
Tsuchinoko |
Sokrovenno South, Tikhogornyj Type: Snake |
|
Cobalt Blue Tarantula |
![]() ![]() Ponizovje West Type: Land-Based Animal |
|
Emperor Scorpion |
![]() ![]() Krasnogorje Mountain Base Type: Land-Based Animal |
|
Parrot |
![]() ![]() Sokrovenno South Type: Land-Based Animal |
|
White-Rumped Vulture |
![]() ![]() Krasnogorje Mountain Base Type: Land-Based Animal |
|
Red Avadavat |
![]() ![]() Graniny Gorki Lab Exterior: Outside Walls Type: Land-Based Animal |
|
Magpie |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Land-Based Animal |
|
Sunda Whistling-Thrush |
![]() ![]() Dremuchij North Mission: Virtuous Mission - Type: Land-Based Animal |
|
Rat |
![]() ![]() Rassvet Mission: Virtuous Mission - Type: Land-Based Animal |
|
European Rabbit |
![]() ![]() Bolshaya Past Crevice Type: Land-Based Animal |
|
Japanese Flying Squirrel |
![]() ![]() Dremuchij East Type: Land-Based Animal |
|
Markhor |
![]() ![]() Dremuchij South Type: Land-Based Animal |
|
Vampire Bat |
![]() ![]() Chyornaya Peschera Cave Branch Type: Land-Based Animal |
|
Kenyan Mangrove Crab |
![]() ![]() Chyornaya Peschera Cave Branch Type: Water-Based Animal |
|
Bigeye Trevally |
![]() ![]() Ponizovje South Type: Water-Based Animal |
|
Maroon Shark |
![]() ![]() Chyornaya Peschera Cave Branch Type: Water-Based Animal |
|
Arowana |
![]() ![]() Chyornyj Prud Type: Water-Based Animal |
|
Indian Gavial |
![]() ![]() Dremuchij Swampland Mission: Virtuous Mission - Type: Water-Based Animal |
|
Otton Frog |
![]() ![]() Dremuchij East Type: Water-Based Animal |
|
Tree Frog |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Water-Based Animal |
|
Poison Dart Frog |
![]() ![]() Chyornyj Prud Type: Water-Based Animal |
|
Russian Oyster Mushroom |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Mushroom |
|
Ural Luminescent Mushroom |
![]() ![]() Svyatogornyj West Type: Mushroom |
|
Siberian Inkcap |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Mushroom |
|
Fly Agaric |
![]() ![]() Graniny Gorki South Type: Mushroom |
|
Russian Glowcap |
![]() ![]() Chyornaya Peschera Cave Branch Type: Mushroom |
|
Spatsa |
![]() ![]() Graniny Gorki Lab 1F Type: Mushroom |
|
Baikal Scaly Tooth |
![]() ![]() Dremuchij East Type: Mushroom |
|
Yabloko Moloko |
![]() ![]() Dremuchij North Mission: Virtuous Mission - Type: Other |
|
Russian False Mango |
![]() ![]() Dremuchij South Mission: Virtuous Mission - Type: Other |
|
Golova |
![]() ![]() Dremuchij Swampland Mission: Virtuous Mission - Type: Other |
|
Vine Melon |
![]() ![]() Svyatogornyj South Type: Other |
|
Baltic Hornet's Nest |
![]() ![]() Dremuchij Swampland Mission: Virtuous Mission - Type: Other |
|
The Pain Hornet's Nest |
![]() ![]() Chyornaya Peschera Cave Type: Other |
|
Ration |
![]() ![]() Bolshaya Past Base Type: Other |
|
Instant Noodles |
![]() ![]() Ponizovje Warehouse 1F Type: Other |
|
Calorie Mate |
![]() ![]() Bolshaya Past Base Type: Other |
|
The Beginning is the End |
![]() ![]() Dremuchij North Type: Film Reel How to Get: Hold up the first soldier you see (he should have a radio strapped to his chest) when you enter Dremuchij North. He'll drop the 8mm film reel, The Beginning is the End. |
|
Gotcha This Time |
![]() ![]() Dolinovodno Type: Film Reel How to Get: Two guards will be patrolling the bridge. Use your SVD or Binoculars to zoom in and find the one that has a silver film container strapped to his chest. This is the one you want to hold up. He and his partner will separate once they get to the center of the bridge, allowing you to isolate them from one another. |
|
Get Down |
![]() ![]() Bolshaya Past South Type: Film Reel How to Get: In the northern half of Bolshaya Past South, you'll encounter an electric fence with a gap in the middle guarded by 2 Soldiers. The solder on the west side of the gap will have the 8mm Film Reel. The best approach is to attack from behind. Knock out the east soldier before holding up the one with the Get Down! film. |
|
Payback |
![]() ![]() Bolshaya Past Base Type: Film Reel How to Get: The one soldier guarding the entrance to the central building of the base will be holding the 8mm Film Reel. To hold him up, enter the building via the door to its east. Once inside, open the southern door of the building and you'll find yourself in perfect CQC range to hold the soldier with the film reel up. Pull it off and you'll get the Payback film. |
|
Cat-Like Behavior |
![]() ![]() Ponizovje West Type: Film Reel How to Get: The soldier right next to the warehouse on the dock will be the one with the 8mm Film Reel. Once you've dealt with the other soldiers on the docks, use something like food or an empty magazine to get the soldier to turn around. From there, hold him up to get the Cat-Like Behavior film. |
|
The Quick Version |
![]() ![]() Ponizovje Warehouse Type: Film Reel How to Get: The first time you enter the building, the soldier on the 3rd floor will have the 8mm Film Reel. Deal with the guards on the first floor then, wait until the 3rd floor soldier's back is turned before holding him up. He will drop the Quick Version film. |
|
The Joy |
![]() ![]() Graniny Gorki Lab Exterior - Outside Walls Type: Film Reel How to Get: After passing the electric fence, loop over to the east side of the outer walls (deal with the 2 guards and dog along the way). Once there, you'll notice a door along the wall. Stick close to it then use the "Make Noise" option to knock. Take cover and wait until the soldier comes out. Hold him up to get The Joy film. |
|
Metal Gear S... |
![]() ![]() Svyatogornyj East Type: Film Reel How to Get: The guard inside the house to the northeast of the area will have the film. Enter the house using any of the entrances available then hold him up while his back is turned to get the Metal Gear S... film. |
|
Diehard |
![]() ![]() Krasnogorje Mountain Base Type: Film Reel How to Get: The one RPG-wielding soldier along the eastern cliff face will be your film holder. Deal with the 2 guards nearby before placing a Book down at the base of his ledge overlook. This'll tempt the soldier to go down. Once he has his back turned, hold him up to get the Diehard film. |
|
The Ultimate Weapon |
![]() ![]() Krasnogorje Mountaintop Type: Film Reel How to Get: After meeting with EVA in the ruins, Flame Troopers will start appearing in this area. The one located near the AA-gun to the west will be your film holder. Hold him up to get The Ultimate Weapon film. |
|
Made in the U.S.A. |
![]() ![]() Groznyj Grad Weapons Lab - West Wing Corridor Type: Film Reel How to Get: In the West Wing Corridor, 2 sentries will be standing guard outside Sokolov's room. Knock out the one on the left as you enter. This'll distract the one on the right and give you enough time to close the distance and hold him up. He drops the Made in the U.S.A. film. WARNING: Don't approach the sentries while wearing the Officer uniform. This will progress the story, causing you to miss out on this film reel. |
|
Basashi |
![]() ![]() Groznyj Grad Torture Room Type: Film Reel How to Get: You'll find the film holder inside the guard room. Knock out the guard in the hallway before holding up the guy inside the small room. If successful he'll drop the Basashi film. |
|
Close Call |
![]() ![]() Groznyj Grad Northeast Type: Film Reel How to Get: This film reel only becomes available when you return to Groznyj Grad during the day. The soldier will be hard at work drilling a few recruits. First, knock out the guard in the nearby watchtower to lessen witnesses. Then, knock out the 3 trainees so they can act as a distraction. While the instructor investigates, sneak up on him and hold him up to get the Close Call film. |
|
He's Still Got It |
![]() ![]() Groznyj Grad Weapons Lab - Main Wing Type: Film Reel How to Get: This film reel will be held by one of the guards in the northern section of the room (near the trucks). Since they're isolated, it should be as easy as getting close to them with the Maintenance uniform on, before quick-swapping to something else in order to pull out your gun for a hold up. If successful, he'll drop the He's Still Got It film reel. |
|
Metal Gear Raiden: Snake Eraser |
![]() ![]() Zaozyorje East Type: Film Reel How to Get: This one is a bit tricky because the soldier won't cooperate if you do a normal hold up. Once his arms are raised, start shooting at the ground near his waist to frighten him. This'll cause him to drop the final 8mm Film Reel - Metal Gear Raiden: Snake Eraser. |
|
The Incandescent Cobra Unit |
Type: Film Reel How to Get: Unlocks after completing the story. |
|
Granin Rising |
Type: Film Reel How to Get: Obtain a total of eight 8mm film reels. |
|
Medal |
Type: Film Reel How to Get: Obtain a total of fifteen 8mm film reels. |
Silver
|
It Ain't Easy Being Green |
|---|---|
| Attack all 64 Kerotans. | |
Silver
|
It's Duck Season |
| Attack all 64 GA-KOs. | |
|
|
Gastronome |
| Achieve a 100% for your Food Collection. | |
|
|
A Snake Has Many Skins |
| Obtain every camouflage uniform and face paint. |
There are two silver trophies that you can acquire after obtaining all Kerotan frogs and GA-KO ducks in MGS Delta.
You can also obtain a gold trophy by collecting every camo and face paint in the game, as well as another trophy called Gastronome for eating all Food items in the game.

Similar to the original MGS3, finding all 64 Kerotan Frogs in MGS Delta will reward you with the Stealth Camouflage item. When used, Snake turns fully invisible.
Finding all 64 GA-KO will reward you with a brand new item introduced in MGS Delta called the AT-Camouflage, which covers Snake in leaves The only other way to unlock Stealth Camouflage is to finish the game with a FOXHOUND rating.
List of All Camos and Face Paints

Finding all 64 Kerotan frogs rewards you with the Kerotan title. Likewise, finding all 64 GA-KO Ducks rewards you with the GA-KO title.

| Metal Gear Solid Delta Guides | |
|---|---|
Walkthrough |
Bosses |
Tips and Tricks |
Interactive Map |
Weapons |
Camos |
Food Collection |
Trophies |
Equipment |
Snake vs. Monkey |
Snake vs. Bomberman |
Characters |
News |
- |
Metal Gear Solid Delta: Snake Eater Walkthrough & Guides Wiki
All Collectible Locations and Checklist

Genshin Impact Walkthrough & Guides Wiki

Umamusume: Pretty Derby Walkthrough & Guides Wiki
Pokemon Pokopia Walkthrough & Guides Wiki
Honkai: Star Rail Walkthrough & Guides Wiki

Monster Hunter Stories 3: Twisted Reflection Walkthrough & Guides Wiki

Arknights: Endfield Walkthrough & Guides Wiki

Wuthering Waves Walkthrough & Guides Wiki
Zenless Zone Zero Walkthrough & Guides Wiki
Pokemon TCG Pocket (PTCGP) Strategies & Guides Wiki

Monster Hunter Wilds Walkthrough & Guides Wiki

Diablo 4: Vessel of Hatred Walkthrough & Guides Wiki
Cyberpunk 2077: Ultimate Edition Walkthrough & Guides Wiki

Fire Emblem Heroes (FEH) Walkthrough & Guides Wiki
Yu-Gi-Oh! Master Duel Walkthrough & Guides Wiki
Super Smash Bros. Ultimate Walkthrough & Guides Wiki

Pokemon Brilliant Diamond and Shining Pearl (BDSP) Walkthrough & Guides Wiki

Elden Ring Shadow of the Erdtree Walkthrough & Guides Wiki

Monster Hunter World Walkthrough & Guides Wiki
The Legend of Zelda: Tears of the Kingdom Walkthrough & Guides Wiki

Persona 3 Reload Walkthrough & Guides Wiki
©Konami Digital Entertainment
The copyrights of videos of games used in our content and other intellectual property rights belong to the provider of the game.
The contents we provide on this site were created personally by members of the Game8 editorial department.
We refuse the right to reuse or repost content taken without our permission such as data or images to other sites.